# Tasks: kanban, My Plan and the day plan

[Tasks and filters](/docs/entities/tasks) describe task reading and editing. The stagesId filter selects a position in My Plan; stageId belongs to the group kanban.

- [List stages](/docs/task-stages)
- [Create a stage](/docs/tasks/stages)
- [Update a stage](/docs/task-stages/update)
- [Delete an empty stage](/docs/task-stages/delete)
- [Move a task with ordering](/docs/tasks/move-stage)
- [Kanban sorting permission](/docs/tasks/stages-can-move)
- [The key owner day plan](/docs/tasks/day-plan)

The first stage position affects the whole group. The Bitrix24 day plan is limited to 30 tasks and saves truncation when read. Operation pages describe the details and limitations.
